A Royal Appointment for FastTrack Screeding!

Windsor Castle, FastTrack Screeding, Ardex A38

FastTrack Screeding – 1000m2 of the Orangery Roof at Windsor Castle

For more than 25 years, FastTrack Screeding have been producing floor screeding solutions for some of Britain’s heritage brands such as Selfridges Of London, Burberry Of London and Brunel University.

FastTrack Screeding has been contracted to help reform and protect over 1000m2 of the Orangery Roof at Windsor Castle that had experienced significant aging and deterioration.

FastTrack Screeding with ARDEX UK technical, inspected the roofs and made specifications for a solution that would permanently correct the problems. The team recommended the installation of 20mm ARDEX A38 Rapid Drying Exterior Bonded Screed laid on an ARDEX E100 Primer.

This ARDEX FastTrack System was recommended because of its significant cost saving, relative ease of installation, rapid drying and long-term stability.

We have completed phase 1 of a 3-phase project for this 1049m2 Orangery Roof Section and we are very much looking forward to continuing works with The Royal Household on this and hopefully a number of different projects.

James Warner of FastTrack Screeding Ltd says. “The main contractors at Windsor Castle, Sally Strachey Conservationist and Holland Historic, have been one of the most professional teams we have had the pleasure of working with. We look forward to continuing our time with them.”

Leave a Reply

Your email address will not be published. Required fields are marked *